Avon Fire Department and Avon Police Department drove Santa and Buddy around town on Saturday, December 23rd to the delight of many towns people.
Read moreAuthor: Kristen Potter
Santa Claus is Coming to Avon December 23
Santa Claus is Coming to Avon! Saturday December 23, 2023, at 8:30 am sharp!
Read more*VIDEO* Avon Fire Station Re-Dedication
Click here to watch the Fire Station Re-Dedication
Read moreFire Department Project Update – August/September 2021
Schedule: Substantial Completion was achieved on August 3, 2021. Concerns/Issues: Ceiling occupancy/vacancy sensors in various areas are not working. Attic stairway light not dimming. Apparatus Bay lighting goes into emergency mode when shut off. Apparatus Bay floors showing tire marks.
Read moreFire Department Project Update – July 2021
Demolition: Demolition and abatement work is complete. Concrete: Concrete work is complete. Masonry: The lead flashing at the front entrance roof and the cornice returns were completed. Metals: Miscellaneous Metals work is complete. Caulking :Interior caulking at the apparatus bay
Read moreFire Department Project Update – June 2021
Masonry: Brickwork restoration, replacement and re-pointing is complete. The stone veneer at the retaining wall is complete. The brick sills at the front of the station were replaced. Roofing: Gutter and sheet metal work is ongoing. The zinc coated plumbing
Read moreFire Department Project Update – May 2021
Weather: Weather was favorable for construction. No time was lost to unseasonable weather this month. Demolition: Phase 2 Demolition and Hazardous Waste Remediation was completed. Selective Demolition of the administration side and apparatus bay was completed. Cast-in-Place Concrete: Front apron
Read moreFire Department Project Update – April 2021
Demolition: Phase 2 demolition and hazardous waste abatement is ongoing. The Apparatus Bay doors on Main Street were removed and replaced. Cast-in-Place Concrete: Dumpster pad and Tight Tank Apron were formed and placed. Masonry: Brick veneer was installed at the
Read moreFire Department Project Update – March 2021
Cast-in-Place Concrete: Concrete landings were placed at the Southside Addition, the Rear Vestibules, and the Apparatus Building. Equipment pads were placed for the AC Condenser, Compressor, and the Water Heater. Masonry: Brick Veneer installation which began this week is ongoing.
Read moreFire Department Project Update – February 2021
In February 2021 the committee brought an article to Special Town Meeting refunding the monies for Fagan Drive costs from the Stabilization account in the amount of $312,683. The article also called for using $700,000 from the Stabilization fund in
Read more