Read moreSchedule: Substantial Completion was achieved on August 3, 2021. Concerns/Issues: Ceiling occupancy/vacancy sensors in various areas are not working. Attic stairway light not dimming. Apparatus Bay lighting goes into emergency mode when shut off. Apparatus Bay floors showing tire marks.
Read moreDemolition: Demolition and abatement work is complete. Concrete: Concrete work is complete. Masonry: The lead flashing at the front entrance roof and the cornice returns were completed. Metals: Miscellaneous Metals work is complete. Caulking :Interior caulking at the apparatus bay
Read moreMasonry: Brickwork restoration, replacement and re-pointing is complete. The stone veneer at the retaining wall is complete. The brick sills at the front of the station were replaced. Roofing: Gutter and sheet metal work is ongoing. The zinc coated plumbing
Read moreWeather: Weather was favorable for construction. No time was lost to unseasonable weather this month. Demolition: Phase 2 Demolition and Hazardous Waste Remediation was completed. Selective Demolition of the administration side and apparatus bay was completed. Cast-in-Place Concrete: Front apron
Read moreDemolition: Phase 2 demolition and hazardous waste abatement is ongoing. The Apparatus Bay doors on Main Street were removed and replaced. Cast-in-Place Concrete: Dumpster pad and Tight Tank Apron were formed and placed. Masonry: Brick veneer was installed at the
Read moreCast-in-Place Concrete: Concrete landings were placed at the Southside Addition, the Rear Vestibules, and the Apparatus Building. Equipment pads were placed for the AC Condenser, Compressor, and the Water Heater. Masonry: Brick Veneer installation which began this week is ongoing.